{"id":38912,"date":"2017-06-13T08:51:19","date_gmt":"2017-06-13T08:51:19","guid":{"rendered":"https:\/\/www.mumnet.cn\/hydropower-for-central-asia"},"modified":"2022-02-14T13:15:24","modified_gmt":"2022-02-14T13:15:24","slug":"hydropower-for-central-asia","status":"publish","type":"post","link":"https:\/\/www.mumnet.cn\/ch-en\/hydropower-for-central-asia","title":{"rendered":"Hydropower for Central Asia"},"content":{"rendered":"
Sustainable energy supply: About 100 kilometers north of Dushanbe, the capital of Tajikistan, a dam is being built on the river Vakhsh. The Militzer & M\u00fcnch Group handles the door-to-door transport of the components for two gas-insulated switchgears for the hydropower station, which is part of the dam.<\/b><\/p>\n
Once finished, the Rogun dam will be the world\u2019s tallest river dam, measuring 335 meters in height. The Rogun hydroelectric station is to supply several regions of Central Asia with electricity. Six 600-megawatt turbines will produce about 13.3 billion kilowatt hours of electricity per year. In the switchgears, the electric energy is distributed or transformed, which prevents overload and shorts.<\/p>\n
Secured cargo<\/b><\/p>\n
In the course of this year, Militzer & M\u00fcnch transports numerous parts for two switchgears by truck to the Rogun dam construction site. The project is handled by the Militzer & M\u00fcnch team in Nuremberg. Components for the switchgear systems come from Germany, Turkey and Poland.<\/p>\n
The total weight of the parts amounts to 1,800 tons. On the long transport routes, the 180 to 200 trucks \u2013 30 of them with an over height of 3.4 meters \u2013 cross several narrow mountain passes. At many passages, there\u2019s the danger of falling rocks or avalanches. Therefore, the packaging of the goods must be heavy-duty and secure for transport, so that the cargo arrives at the destination undamaged.<\/p>\n
Perfect coordination Sustainable energy supply: About 100 kilometers north of Dushanbe, the capital of Tajikistan, a dam is being built on the river Vakhsh. The Militzer & M\u00fcnch Group handles the door-to-door transport of the components for two gas-insulated switchgears for the hydropower station, which is part of the dam. Once finished, the Rogun dam will be […]<\/p>\n","protected":false},"author":1,"featured_media":31848,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1533,1508,900,2016],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/posts\/38912"}],"collection":[{"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/comments?post=38912"}],"version-history":[{"count":0,"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/posts\/38912\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/media\/31848"}],"wp:attachment":[{"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/media?parent=38912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/categories?post=38912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mumnet.cn\/ch-en\/wp-json\/wp\/v2\/tags?post=38912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
\n<\/b>
\nIn order to meet the timelines of the construction schedule, the Militzer & M\u00fcnch team coordinates 20 to 25 truck transports per week. The customs clearance is done by the consignee.<\/p>\n<\/div>\nElectricity from water power<\/h3>\n
\n